Why it pays to know the LOE before signing with a builder

Anyone who builds a house to live in acts as the developer: the person who decides, drives, schedules and finances the works. Law 38/1999 on Building Regulation (LOE) divides obligations between that developer and the other parties, and sets out what happens if defects appear after completion. The Technical Building Code then develops, in technical language, the safety and habitability requirements laid down by this law. Knowing who does what helps you read a quote, draft the contract and know whom to claim against. This guide summarises the consolidated text published in the Official State Gazette (BOE); it does not replace advice from a technical professional or a lawyer for a specific case.

The parties to the works and what each one does

For a newly built home the law requires a project. The designer drafts it on behalf of the developer and, for residential buildings, must be an architect. The builder carries out the works in line with the project and the instructions of the site management team; the builder must appoint a site manager, provide adequate resources, answer for its subcontractors and sign the setting-out record and the handover record. The site director manages the technical and planning development of the works, checks that foundations and structure suit the ground and signs the final certificate. The construction execution director supervises the physical execution, the acceptance of products and testing; for housing this is a technical architect. The developer, for their part, must hold title to the plot, obtain the permits, sign the handover and take out the insurance that corresponds to them.

Handover of the works: the moment that starts the clock

Handover is the act by which the builder delivers the works and the developer accepts them, with or without reservations. It is recorded in a document signed at least by both, stating the date of the final certificate, the final cost of material execution, the specific reservations with their deadline for correction and the guarantees required from the builder; the final certificate from the site management team is attached. The developer may refuse handover in writing, giving reasons. If they do not, the law treats handover as tacitly given thirty days after notice that the works are finished. This is an important practical point: the liability and guarantee periods run from handover, so it is worth inspecting the house calmly and noting any defect before that period ends.

Liability periods: 1, 3 and 10 years

The LOE distinguishes three periods counted from handover without reservations or from the correction of reservations. For ten years the parties are liable for damage caused by defects in the foundations, columns, beams, floor slabs, load-bearing walls or other structural elements that compromise strength and stability. For three years they are liable for defects in building elements or installations that fail to meet habitability requirements, such as health conditions, protection against noise or energy saving. And for one year the builder is liable for workmanship defects in finishes. Liability is individual for each party and joint when the cause cannot be determined. In addition, once the damage occurs, the right to claim expires after two years.

Ten-year insurance and the self-builder exception

The law provides a guarantee for each period: a one-year insurance or guarantee, which the developer may replace by retaining five per cent of the material execution amount; a three-year one; and a ten-year one, with minimum cover equal to one hundred per cent of the final cost of material execution. For buildings whose main use is housing, the ten-year guarantee is compulsory, and without proof of it the new-build deed is not registered. There is one exception: an individual self-builder of a single detached house for their own use is not obliged to take it out. However, if they sell the house before ten years have passed, unless otherwise agreed, they must take out the insurance for the remaining time, unless the buyer expressly waives it and the seller proves they have lived in the home. It is best to decide this at the outset, with the construction quote in hand.

What to prepare before asking for a quote

Before asking builders for a price, gather the land registry extract or title proving your right to the plot, the cadastral and planning data of the plot and, if it already exists, the basic or execution project with the architect's name. Ask who will act as site director and construction execution director, whether the builder offers the one-year guarantee or prefers the five per cent retention, and whether you intend to take out ten-year insurance even if the home is for your own use. Ask for the quote to separate material execution from fees and charges, and for the contract to provide for the handover record, delivery of the as-built documentation and the Building Book, and how defects will be reported during the first year.

YOUR NEXT STEP

Turn your idea into a feasible home.

Tell us where you want to build, what you need and whether you already have a plot or plans. We will look for builders according to area, specialism and availability.

Request a quote for my house

Sources consulted

A Constructores.com guide. Informational content; every project requires professional assessment.